Saturday, December 27, 2008

Friday, October 17, 2008

Time to clean up


Final grading and sidewalks make the outside of the house look almost finished. Just need some landscaping and railing to complete the look.

Wednesday, October 15, 2008

While we were out...

...things continue to progress.
In the picture: tile, cabinets and countertops in the master bathroom.

Monday, October 6, 2008

We didn't make it

Lucas Kung was born on October 1 via emergency c-section.

We were hoping to move before the baby comes but Lucas had other plans. We still have about four weeks to go until we can move and our, now complete, family cannot wait.

Tuesday, September 30, 2008

Front porch concrete flat work

BM 1635 - water's edge


2021grove dining room:

dropped ceiling with an accent color
cove lighting
light well and
double-sided fire place

The perfect space for a romantic candle light dinner or a casual party.

Friday, September 12, 2008

Kitchen cabinets and flooring

You could LIVE next door


2021grove is now officially listed on Denver MLS. We need a next door neighbor!

Please visit our site at:
http://2021grove.com/

Wednesday, September 10, 2008

Cabinets goign in

2021grove:
Mastercraft maple cabinets in the downstairs bar.

Tuesday, September 2, 2008

This is where Santa is going to bring presents this year


Julia is visiting the site. Her favourite new-found toy is a piece of foam insulation that can be torn into a thousand little pieces. Julia also is checking progress in her new room and asking if walls are pained pink like she requested (not yet!)

Thursday, August 28, 2008

Gyp board inspection today


Two story light well and fire place on 2021grove.

Friday, August 22, 2008

No dumpster

The big ugly dumpster is gone from the front yard to make room for sheetrock to be delivered today.

Insulation

We have passed the insulation inspection and our painter Joe Cortez (in the picture) is painting interior doors.

Tuesday, August 19, 2008

Rough-in inspections passed


We have passed all rough-in inspections and the spray insulation is going in today. Because of the harmful fumes nobody else can work at the site today. But things will really pick up tomorrow. Batt insulation, interior door installation and painting all should happen this week. The gypsum board is scheduled for next week and finishes will follow beginning of Septemeber.

Thursday, August 7, 2008

Interior work


We have passed electrical inspection and are just days away of having all the rough-in inspections done. Fire places are in. It's a true race with time...

Wednesday, July 30, 2008

Calling on you all the color critics


The stucco color is done. We are very pleased. The colors have a bit of the historic feel, a bit of a modern Art Deco feel and work really well with the brick. The brick still needs to be power washed to reveal the true quality but already looks good.

Thursday, July 24, 2008

Finally things are moving on the inside


Finally after threatening Tony (our mechanical contractor) with the law suite he got the message. He subed-out the work and things are moving ahead. Electrical and Plumbing are working too. There is finally visible progress on the interior.

Tuesday, July 15, 2008

Our current house goes on the market


Our house went on the market this week.
We will miss this place. Nice street, great neighbors, coffee shops, Tattered Cover Book Store. It’s the only HOME that Julia knows. I should remove and take with me the plank of flooring where she took her first step
...

http://www.liveurbandenver.com/search/property_details.asp?ID=680089&ds=METROLIST

click on Virtual Tour for more pictures.


Thursday, July 10, 2008

Stucco is going up

Today the crew installs Tyvek paper and wire mash for stucco. We can't wait to see the colors of stucco as the building takes shape.

Tuesday, July 8, 2008

Interior work


The framing is complete. Here is the problem: our mechanical contractor (Tony Quintana with Quintana’s Heating & Cooling) is a notorious no-show. Other trades are waiting for him to finish so they can connect to his equipment...

Wednesday, June 18, 2008















We couldn't be live it. A young deer came to check out our construction. What can we say, it's a green design, even Bambi came to enjoy it!

Monday, June 16, 2008

Monday, June 9, 2008







After interviewing three Realtors we decided to go with June. We are excited to start marketing our properties. We need to sell the house we currently live in at 1314 Clayton (it will go on the market July 9th) and 2021 Grove.

Sunday, May 4, 2008

Monday, April 7, 2008

Sunday, March 9, 2008

Monday, February 25, 2008